In addition to this main (normal gas test) sequence, the gas analyser also has to meet the conditions of several other sequences in order to be approved. In a 'reaction test', it is measured how long it takes after opening the valve before the analyser measures the real flow, incorporating snapshots with a photo camera, also part of the testing protocol. In a 'low-flow test', in flow-control mode the flow is decreased in steps of 5%, where at a certain point the analyser must give an ‘undersupply’ alert that it detects not enough gas. In a 'tightness test' all valves are shut and on the analyser side a vacuum is created, and then the pressure evolution is measured. In between these sequences, or when switching to another gas mixture, the system is flushed with nitrogen.
The leakage module is a separate part of the test facility, with a thermal mass flow controller (EL-FLOW Prestige) and a piezo control valve as main components. Leakage in the system is simulated by supplying an exact ratio of synthetic air (nitrogen/oxygen) to the test gas mixture. The gas analyser has to detect this, which is another testing sequence for approval.
Control and programming of the sequences has been performed on a LabVIEW basis on two PC's of the client. The entire LabVIEW environment continuously communicates with the skid and the leakage module via Modbus. The various test sequences are selected and displayed on the program interface. Buttons allow for an ergonomic operation of the test facility. Target and actual values of the respective sequences are displayed in a flow diagram.
The monitoring of the test facility includes internal measurement variables such as input and output pressures from the gas analyser, process temperature via a PT100 temperature sensor, mass flows, as well as ambient data such as air pressure, temperature and relative humidity from a 'weather station', which are compared with the process data in the control system. Automatically generated logs completed with manual notes with time stamp are archived in test reports. These reports are stored at PTB, and will also be part of the legal protocol that is created for the type approval.
The entire measurement process is semi-automatic, to meet the client's requirement to have a high degree of automation on the one hand, for example by keeping the ratio between the test gas and the synthetic air stable during leakage testing. On the other hand, there is freedom to make interventions, for example by (also) manually opening of the piezo valve.
The process for conducting a type approval as described here meets the ISO 17025 standard with general requirements for the competence of testing and calibration laboratories. The approval is needed for newly developed analysers, but also for modified and refurbished series.
Regarding these high requirements of accuracy and reliability, the Bronkhorst devices inside the test facility need to be easily dismountable, in order to be re-calibrated themselves. To this end, special VCR fittings inside are used allowing a tension-free (dis-) assembly of the measuring components.
The solution is such that on one hand the traditional bypass for the existing pressure control is no longer needed, on the other hand a special optimisation (e.g. no dead legs) could reduce the operational volume of the testing facility. Both meaning an efficient and sustainable use of expensive calibration gases and much less waste.
Due to the complexity of this solution, teams of Bronkhorst and PTB worked closely together. As a result, the factory acceptance test at Bronkhorst in Ruurlo, was not a 'discovery' but already 'recognition' of the already virtually known system. The client was practically immediately able to carry out the test runs on his own.
This solution is relevant for clients that have the same request of complexity, but not necessarily the means to do their own development projects, including programming and assembling. This specific solution is also interesting for state-driven national metrology institutes in other countries.